Short-term loans that are repaid by a planned take-out: underwrite the take-out, the timeline, and what happens if it slips.
3 min read · Last updated Oct 7, 2026 · Educational only, not investment advice
A bridge loan provides money now that is meant to be repaid soon by something else: a bond issue, an equity raise, an asset sale or permanent financing. Bridges fund acquisitions that need to close quickly, construction before permanent financing, or a gap before a planned sale.
The lender's main question isn't long-term cash flow. It's how likely the take-out is, how soon, and what the lender owns if it doesn't happen.
Not the same as a bridge project
A bridge loan is a financing structure. Financing an actual bridge, the structure over a river, is infrastructure lending. See Infrastructure lending.
| Metric | What it tells the lender |
|---|---|
| Take-out probability and timing | How likely the repayment source is, and how soon. |
| LTV or LTC | Loan as a share of asset value, or of total project cost. The cushion if the take-out fails. |
| Step-ups and fees | How the cost rises over time, which pushes the borrower to refinance. |
| Extension tests | What must be true to extend, such as a minimum value or coverage. |
| Cost of carry | Interest and fees while the bridge is outstanding, and whether a reserve covers them. |
Model at least three paths, because a bridge's risk is about timing as much as value.
| Scenario | What happens | What to show |
|---|---|---|
| On time | The take-out closes as planned. | Total cost to the borrower, and the lender's return including fees. |
| Late | The take-out slips and the bridge is extended once or twice. | Whether extension tests are still met, the step-ups paid, and whether the interest reserve runs out. |
| Failed | No take-out. The lender holds the loan to maturity or enforces. | The asset value under stress, LTV at that value, and the expected recovery. |
Illustrative only: a $100M bridge against an asset worth $160M is about 63% LTV. If the asset's value falls 25% while the take-out is delayed, LTV rises to about 83%, which leaves much less room if the lender has to enforce.
Practice on the acquisition bridge case in the library. The model template for that case runs month by month: step-up pricing, duration fees, the interest reserve and the take-out, then an extension test and downside if the take-out fails.